Professional home services. Local pros.Get a free quote →
Services / Cabinet Installation & Refacing

Cabinet Installation & Refacing

Cabinet installation and refacing services transform kitchens and bathrooms without full renovation costs. Whether replacing all cabinets or refreshing existing boxes with new doors and veneers, local cabinet companies deliver professional results.

Why Professional Cabinet Installation & Refacing?

Full cabinet replacement or refacing — both options offered
Stock, semi-custom, and custom cabinet lines
Soft-close hinges and drawer slides standard
Built-in organizers and pull-out shelves available
Refacing costs 40–60% less than cabinet replacement
Professional installation ensures level, plumb, and square results

Our Cabinet Installation & Refacing Process

1
Measurement & Design

Kitchen or bathroom is measured precisely and a cabinet layout is designed to maximize storage and workflow.

2
Cabinet Ordering

Selected cabinets are ordered. Lead times vary from in-stock (1–2 weeks) to custom (8–12 weeks).

3
Removal

Existing cabinets are carefully removed. Plumbing and electrical are protected during removal.

4
Installation

Wall cabinets are hung first, then base cabinets are set level and plumb. Doors are hung and adjusted, and hardware is installed.

Cabinet Installation & Refacing by City

Our local pros understand the unique conditions of your city — climate, home types, and seasonal challenges.

Frequently Asked Questions

What's the difference between stock, semi-custom, and custom cabinets?
Stock: pre-built in standard sizes, lowest cost, available immediately. Semi-custom: more sizes and options, 4–8 week lead time. Custom: built to exact specifications for unusual spaces or high-end projects, 8–16 week lead time and highest cost.
What is cabinet refacing?
Refacing replaces cabinet doors, drawer fronts, and applies new veneer to cabinet box exteriors — keeping the existing boxes in place. It costs 40–60% less than full replacement and takes 3–5 days vs. 2–3 weeks.
How long does cabinet installation take?
A full kitchen cabinet replacement takes 2–3 days for a typical kitchen. Countertop installation follows after cabinets are set, adding another 1–2 days once countertops are fabricated.
Can I install cabinets myself?
Skilled DIYers can handle stock cabinet installation. However, ensuring cabinets are level, plumb, and square — especially around irregular floors and walls — is challenging. Mistakes are expensive to fix once countertops are in.

Ready to book Cabinet Installation & Refacing?

Get a free quote from a local pro in your area.

Get a Free Quote